BTeV Pixel Detector
Individual project pages
Presentations
- BTeV Pixel Meeting, 11/05/04
"Update on Pixel Offline Study".
- BTeV Pixel Meeting, 10/29/04
"Pixel Testbeam Offline Update".
- BTeV Pixel Meeting, 09/17/04
"Pixel offline status".
- BTeV Pixel Meeting ???, 07/02/04
"Pixel offline study".
- BTeV Pixel Meeting, 07/03/03
"Pixel detector testbeam data file format".
- BTeV Pixel Meeting, 05/01/03
"Pixel test beam offline code demo".
- BTeV Pixel Meeting ??, 04/23/04
" xxx ".
- BTeV Pixel Meeting, 01/16/03
"Pixel Beam Test Offline Code Status".
- BTeV Pixel Meeting, 05/09/02
"Status and plan of pixel test beam offline code".
- BTeV Pixel Meeting, 01/07/02
"Beam Test Offline Code".
- BTeV Pixel Meeting, 08/06/01
"Number of Comparators for FPIX2".
- BTeV Pixel Meeting, 08/06/01
"Offline Code for Next Beam Test".
- BTeV Pixel Meeting, 06/27/01
"responsibility on next beam test".
- BTeV Pixel Meeting, 04/30/01
"Effective depletion depth".
- BTeV Pixel Meeting, 04/18/01
"Dynamic Range Study".
- BTeV Pixel Meeting, 04/18/01
"FPIX0 electronics test".
- BTeV ???, 04/02/01
"Pixel cross talk Study".
- BTeV Pixel Meeting, 01/15/01
"More results from simulation".
- BTeV Pixel Meeting, 12/18/00
"Pixel detector simulation with magnetic field".
- BTeV Pixel Meeting, 11/06/00
"MC simulation of silicon pixel detector".
- BTeV Pixel Meeting, 10/02/00
"FPIX1 calibration at SU".
- BTeV Pixel Meeting, 05/08/00
"Testbeam alignment status".
- BTeV Pixel Meeting, 04/10/00
"Minuit alignment update".
- BTeV Pixel Meeting, 02/14/00
"Minuit alignment code".
Paper and Notes